FEATURED PROJECT

Meeting a timeline is a critical aspect of any large-scale building project. When it comes to construction in the education sector, however, the stakes are even higher.

Major construction on schools must be completed in the summer when class is not in session. Otherwise, construction would create a highly distracting and potentially dangerous environment, poorly suited for learning. 

Understanding the importance of these time constraints, the Riverhead Charter School knew it needed to rethink construction if necessary additions to the facility were to be completed before the school year began. 

That's why they chose Deluxe Modular. 

With Deluxe's innovative modular construction process fabricating modular units along our half-mile of production lines, meeting this strict schedule was no challenge at all. By the end of the summer, Deluxe was able to install more than 40,000 sq. ft. of classroom, gymnasium, art, music, science and library spaces before students arrived. 

 

Get an Instant Quote View Our Portfolio

Dominican Hall Project Details

  • Total Sq. Feet: 40,219
  • Buildings: 1
  • Modular Units: 94
  • Client: Riverhead Charter School

LATEST BLOGS

DeluxeModular-Blog-The-Differences-Between-Prefab-and-Modular-Construction

The Differences Between Prefab & Modular Construction

Prefabrication is a broad category of construction, which seeks to maximize efficiencies in construction by moving portions of the process off-site. Modularization is the most efficient class of prefabrication.

Read Now


DeluxeModular-Blog-How-Many-Contractors-Do-I-Need-for-Modular-Construction-

How Many Contractors Do I Need for Modular Construction?

Innovative modular construction firms can serve as the sole contractor required to complete a project, but may also allow for additional parties, if preferred.

Read Now


Forbes logo

"[Deluxe] employs architects and engineers from some of the most famous design shops in the world, and can deliver turnkey, ready-to-move-in buildings."

Read More
New York Times logo

"Because construction takes place indoors, there are no delays or damages."

Read More
Avison Young logo

"[Deluxe] can deliver projects 50 percent sooner at more than a 20 percent savings in cost."

Read More